Edit sessions and history

Two features let the user take a change back. An edit session wraps a spell of editing between Edit, Save and Cancel. The history steps back and forward one action at a time with undo and redo. This page explains both, what each returns, and how they work together and with controlled data.

A session remembers the data when it starts, the base. Nothing is held back while it is open: every drag and every updateTask is applied as it happens, runs the before-hook as usual, and emits its own tasksChange. So getTask() and the chart show the edited plan all along. The session adds three things:

  • edit.getChanges() is the net difference from the base: one entry per task whose dates or progress differ, plus the links added and removed. A task dragged away and back is not listed.
  • edit.commit() closes the session and returns that difference (the Save button).
  • edit.rollback() closes the session and puts the base back (the Cancel button). It never asks the before-hooks: a cancel is not vetoed.
gantt.edit.begin(); // { status: 'begun' }
// ... the user drags bars, draws a link ...
gantt.edit.isDirty; // true: there is something to save
gantt.edit.getChanges(); // SessionChanges: what differs from the base
gantt.edit.commit(); // { status: 'committed', changes } or gantt.edit.rollback()

All the session methods are synchronous and return a status:

Call Status Meaning
edit.begin() 'begun' A session is open on the current data.
'already-open' One is already open. It keeps its base and nothing changes.
'busy' A before-hook is being awaited: the change being confirmed belongs to neither side.
edit.commit() 'committed', with changes The session is closed and the data is kept. changes is the SessionChanges.
'no-session' None is open. Nothing was committed.
'busy' A before-hook is being awaited. The session stays open.
edit.rollback() 'rolled-back', with changes The session is closed and the data is back at the base. changes is the inverse.
'no-session' None is open.
'busy' A before-hook is being awaited. The session stays open.
all three 'cancelled' With reason: 'disposed': the chart was destroyed.

edit.getChanges() returns undefined when no session is open, and edit.isOpen and edit.isDirty are booleans. The statuses 'unchanged' and 'rejected' do not occur here: they belong to updateTask and the link calls. Always check status before you trust changes.

Sessions do not nest. A second begin() returns 'already-open', leaves the open session alone and keeps its original base. That makes an Edit button safe to press twice: the second press changes nothing.

edit.isDirty is true while a session is open and getChanges() would list something: a changed task, a created link or a removed link. It is false right after begin(), and it goes back to false when the user drags a task back to where it started.

The dirtyChange event (onDirtyChange) carries { isDirty } and fires only when the flag flips: after an action’s data changes (before that action’s tasksChange), and on commit() and rollback(). Use it to enable the Save button.

rollback() first cancels a drag in progress, then returns the data to the base. The data modes differ in who does the returning:

  • Uncontrolled: the chart puts the base arrays back, the very task and link objects it began with. getTask() shows the base at once.
  • Controlled: the data is yours. When there is something to revert, the chart shows the base values as a draft and is busy until you answer. The event editRollback(sessionChanges) carries what to revert: write it into your tasks with patchTasks, fix your links as described below, and call setTasks and setLinks.

In both modes editRollback is emitted, and its payload is the inverse of the session: each change goes from the current values back to the base values, links.added are links to restore and links.removed are links to drop. No tasksChange, linkCreate or linkDelete is emitted for a rollback. The events come in this order: historyChange, dirtyChange, editRollback.

The links in a SessionChanges are link models. model.id is the link’s id, and model.link is your own Link, which a link from task.dependencies does not have.

There is no separate draft inside a session. getTask(id) shows the current data, with the session’s changes applied (in controlled mode, once you have applied them). getChanges() compares that to the base and is memoized: it returns the same object until something changed. With controlled data, a committed change you had not applied yet when begin() was called belongs to the base.

Until the user presses Edit, the chart is in view mode (editing: false): bars cannot be dragged and links cannot be drawn. Edit starts a session and turns editing on. Save closes the session and sends the plan. Cancel rolls the session back.

import { createGantt } from '@ganttlane/dom';
const gantt = createGantt(container, {
tasks,
links,
editing: false,
onDirtyChange: ({ isDirty }) => {
save.disabled = !isDirty;
},
});
edit.addEventListener('click', () => {
gantt.edit.begin();
gantt.setOptions({ editing: true });
});
save.addEventListener('click', async () => {
const result = gantt.edit.commit();
if (result.status !== 'committed') return; // 'no-session' or 'busy': nothing was committed
gantt.setOptions({ editing: false });
await savePlan(result.changes); // the net changes of the session, or the whole plan
});
cancel.addEventListener('click', () => {
gantt.edit.rollback(); // the chart restores its own data
gantt.setOptions({ editing: false });
});

When the data is yours, one more step is added and it is yours too: write the cancel into your state. The chart will not do it, because it never changes controlled data.

const gantt: Gantt = createGantt(container, {
tasks,
links,
dataMode: 'controlled',
onTasksChange: (changeSet) => {
tasks = patchTasks(tasks, changeSet, gantt.core.getSnapshot().state.derived.model);
gantt.setTasks(tasks);
},
onEditRollback: (changes) => {
// The inverse of the session. Tasks: write it like any change set.
tasks = patchTasks(tasks, changes, gantt.core.getSnapshot().state.derived.model);
gantt.setTasks(tasks);
// Links: drop what the session added, restore what it removed.
const dropped = new Set(changes.links.removed.map((model) => model.id));
links = [
...links.filter((link) => !dropped.has(linkId(link))),
...changes.links.added.flatMap((model) => model.link ?? []),
];
gantt.setLinks(links);
},
});

linkId(link) is the link’s id, or source:type:target with the type defaulting to FS. The edit session example has the whole flow, with a Save that can be refused by the server and puts the last saved plan back, in vanilla and in React.

The history is off until you ask for it:

const gantt = createGantt(container, {
tasks,
links,
history: true, // or { limit: 50 }
onHistoryChange: ({ canUndo, canRedo }) => {
undoButton.disabled = !canUndo;
redoButton.disabled = !canRedo;
},
});
const result = gantt.undo(); // synchronous

The history option is true, false, or { enabled, limit }. The object form is on unless enabled: false. limit is the most entries kept, undo and redo together, and the oldest go first. The default is 100; any whole number from 0 (keep nothing) to Infinity is accepted, and anything else is an invalid-option issue and the default. Turning the history off clears it.

One action is one entry:

  • one drag, with every task it moved;
  • one updateTask call;
  • one link created, or one link deleted.

A progress drag is an entry too. A session is not an entry, its actions are. Not recorded: the view mode, scrolling, selection, expanding rows, and option changes.

Call Status Meaning
undo() and redo() 'undone' or 'redone', with entry The step was applied. entry is the history entry now on the other stack.
'empty' Nothing to step through.
'stale', with entry The data no longer shows the entry’s result, so it cannot be applied. The history was cleared.
'busy' A before-hook is pending, or controlled data holds a change you have not applied yet.
'cancelled' With reason: 'disposed'.

canUndo and canRedo say whether a step is possible, and historyChange fires when either flips.

A step is applied only while the data still shows the entry’s result. If you changed the tasks behind the history’s back (a setTasks in controlled mode that moved them elsewhere), the step is 'stale'.

  • It does not ask the before-hooks. An undo restores a state they already accepted, and a veto would leave the history out of step with the data. It is re-validated like any change set.
  • It emits what an action emits. One tasksChange with reason: 'undo' or 'redo', then taskDatesChange per task, or linkCreate and linkDelete for links.
  • A new action clears the redo entries.
  • A drag in progress is cancelled first.
  • Data from outside. In uncontrolled mode setTasks, setLinks or an option that changes the model clears the history, because its entries describe data that is gone. In controlled mode setTasks is how you apply changes, so the history is kept.
  • Controlled data. An undo is a change like any other: onTasksChange gets it, you apply it, and until you do, further steps return 'busy'.

Undo and redo work inside a session, and the session’s difference follows them. A rollback puts the history back as it was at begin(), so no entry can undo into a rolled-back state. A commit keeps the entries: undo still works after Save, and it changes the chart’s data, not what you already sent.

There are no keyboard shortcuts yet. Bind your own:

document.addEventListener('keydown', (event) => {
if (!(event.ctrlKey || event.metaKey) || event.key.toLowerCase() !== 'z') return;
event.preventDefault();
if (event.shiftKey) gantt.redo();
else gantt.undo();
});
  • Check the status. commit() can return 'busy' or 'no-session'. Closing your Edit mode without looking at it leaves a session open.
  • begin() while editing is a no-op. It reports 'already-open'; the original base is kept.
  • Save does not send anything. commit() only closes the session and returns the difference. With uncontrolled data the data is already in the chart, so read it with gantt.core.getSnapshot().state.tasks or send result.changes.
  • Rollback and editing. Rolling back does not turn editing off. Do it yourself, as above.
  • The history is not saved. It lives in the chart, up to limit entries, and goes when the chart is destroyed.