Dates and time

Every date in ganttlane is a wall-clock date with no time zone. '2026-03-02T09:30' is 09:30 for every viewer, in every zone, in every season. This page lists what a date can be, how the end of a task is read, how durations are written, what comes back from the chart and how to avoid the one mistake that shifts dates: passing instants where the chart expects wall-clock time.

The chart keeps no zone and no daylight saving. A day is always 24 hours, a week 7 days, and arithmetic on dates never depends on where the code runs. Three consequences:

  • A plan is the same for everybody. A kick-off at 09:00 is at 09:00 in Kyiv and in New York.
  • A string with a zone is rejected. '2026-03-02T09:30Z' and '2026-03-02T09:30+02:00' give an unsupported-offset issue and the task is invalid. Convert the value first.
  • A Date or an epoch number is read through the local clock of the runtime: its year, month, day, hour and minute as getFullYear(), getHours() and so on. They become the wall-clock values of the task. Different viewers can read the same instant as different wall-clock times, so prefer strings for a fixed plan (see the trap below).

A date input (DateInput) is a string, a number or a Date. Objects are not accepted.

Input Example Precision What it becomes
Date-only string '2026-03-02' day Midnight of that day
Date and time, T '2026-03-02T09:30' time 09:30 that day
Date and time, a space '2026-03-02 09:30' time The same
With seconds '2026-03-02T09:30:15' time Read, then reported as misaligned and rounded: see below
Date at local midnight new Date(2026, 2, 2) day The local day, midnight
Date with a time new Date(2026, 2, 2, 9, 30) time The local wall-clock time, 09:30
Epoch milliseconds Date.now() as Date new Date(ms) read through the local clock
A zone designator or an offset '2026-03-02T09:30Z' none unsupported-offset: the task is invalid
Another format '2026-3-2', '03/02/2026' none invalid-date
Not a real date '2026-02-30', an invalid Date, NaN none invalid-date

Strings need a four-digit year, a two-digit month and day, and, for a time, hours and minutes. Seconds and milliseconds are accepted by the parser, but the smallest step of the chart is one minute, so a value with seconds is reported as misaligned and aligned (Granularity and alignment). A bad date never throws: the task becomes a row without a bar and carries the issue.

Every task has a precision:

  • 'day': the task sits on whole days. All its values are midnights.
  • 'time': the task has exact moments, aligned to the granularity.

The chart derives it from the input. A task is 'time' when any start or end it uses carries a time of day, or when its duration has a part shorter than a day ('6h', 0.5); otherwise it is 'day'. task.precision overrides that:

Input Derived precision Note
start: '2026-03-02', end: '2026-03-06' day
start: '2026-03-02T00:00', end: '2026-03-06' time T00:00 is a time, even at midnight
start: new Date(2026, 2, 2) day A Date at local midnight counts as date-only
start: '2026-03-02', duration: '1d 4h' time A part shorter than a day
start: new Date(2026, 2, 2), precision: 'time' time Forced: the Date is an exact moment
start: '2026-03-02T10:00', precision: 'day' day Forced: 10:00 is rounded to the day, with an issue

What the precision changes:

  • Alignment. A day task is always aligned to whole days, even when the granularity is '1h'. A time task is aligned to the granularity.
  • The end of a task. The inclusive date-only end (next section) is a rule for day tasks. With precision: 'time' set on the task, every value is an exact moment, so a date-only end is that midnight and no longer covers its day.
  • Dragging. With scheduling.keepDayPrecision (on by default) a day task stays on whole days when dragged, whatever the snap step. With false a drag can turn it into a time task.
  • Working time. A working-day count in 'working' mode uses the day rule for day tasks and exact working time for time tasks: The work calendar.

record.precision shows the result. A task that has both date-only and timed values, such as start: '2026-03-02T10:00', end: '2026-03-04', is a time task whose date-only end still covers its whole day: it stops at the start of March 5.

A bar covers the half-open interval from start to endExclusive. How you write the end differs:

  • A date-only end is the last day, inclusive. start: '2026-03-02', end: '2026-03-06' covers five days, Monday to Friday, and the bar stops at the start of March 7. This is how people write ranges.
  • An end with a time is the exact moment the task ends, exclusive. end: '2026-03-02T11:00' stops at 11:00.

dates.endInclusive (default true) switches the first rule: with false a date-only end is the first day after the task, like an exclusive end.

Input endInclusive: true (default) endInclusive: false
start: '2026-03-02', end: '2026-03-06' Mar 2 to Mar 6: 5 days, stops Mar 7 00:00 Mar 2 to Mar 5: 4 days, stops Mar 6 00:00
start: '2026-03-02', duration: 3 Mar 2 to Mar 4, stops Mar 5 00:00 The same
start: '2026-03-02T09:00', end: '2026-03-02T11:00' Two hours, stops 11:00 The same
start: '2026-03-02T09:00', end: '2026-03-04' Stops Mar 5 00:00: the date covers its day Stops Mar 4 00:00
start: '2026-03-02', end: '2026-03-02' One day Zero length

The rows with a time of day assume a sub-day scheduling.granularity; at the default '1d' the times are rounded to whole days. The same semantics apply when the chart gives dates back:

  • record.end and TaskDates.end (the second argument of onTaskDatesChange) are the last day, at midnight, for a day task of non-zero length, and the exact end otherwise.
  • record.endExclusive is always the half-open end, whatever the option says. Draw and compute with it; show end to people.
  • updateTask(id, { end }) reads a date-only end as an input does.
  • patchTasks writes dates back in the form the task already has (a Date stays a Date, a string stays a string of the same precision), so a round trip keeps your end form.

An end before the start is an end-before-start error. Equal values are fine: with the default option a date-only pair on one day is a one-day task.

A duration (and a link lag) is how long something lasts. Four forms are accepted:

Form Examples Rules
A number 3, 0.5 Days. Only in a task duration and a link lag. A lag can be negative
A string '3d', '6h', '1d 4h', '30min' Whole numbers followed by a unit, separated by single spaces, each unit at most once
An ISO 8601 duration 'P1DT4H', 'PT90M', 'P2W' Years, months, weeks, days, hours, minutes. No seconds, no fractions, no sign
An object { days: 1, hours: 4 } Fields years, quarters, months, weeks, days, hours, minutes: whole numbers, at least one

The string units:

Unit Means Unit Means
y calendar years (12 months) d days (24 hours)
q calendar quarters (3 months) h hours
mo calendar months min minutes
w weeks of 7 days
  • mo is months and min is minutes. A bare 'm' is rejected as ambiguous, as are seconds ('30s'), fractions ('1.5d') and signs ('-2d').
  • Months, quarters and years are calendar parts. They are added first, with the day clamped to the end of the month: start: '2026-01-31', duration: '1mo' stops at the start of February 28 (Duration keeps them apart from the fixed part for this reason). They are not allowed in a lag.
  • A number is days only where it says so. A task duration and a link lag take a number. Other durations, such as scheduling.granularity, take a string or an object, so granularity: 1 is an invalid-duration issue.
  • A malformed duration is an invalid-duration issue and the task is invalid, or the link is dropped.

A task has either an end or a duration, never both in effect: with both, end wins. The length of a duration depends on durationMode: calendar time by default, or only working time with 'working'. A task cannot be longer than ten years (too-long).

The smallest unit is the minute. scheduling.granularity goes down to '1min', and a duration cannot have seconds. A string with seconds is parsed and then rounded by the same rules as any misaligned value, with a misaligned warning.

Where Form
TaskRecord (start, end, endExclusive, progressDate) Local Dates with the wall-clock values of the task
onTaskDatesChange, onRangeChange, getVisibleRange, onScroll Dates
ChangeSet, SessionChanges, state.derived.model Floating numbers, so that they go back into the core and patchTasks

toDate(value) from @ganttlane/core turns a floating number into a local Date; parseDateInput(input) goes the other way and returns the number with the precision, or an issue.

One daylight-saving detail: a wall-clock time that does not exist in the viewer’s zone is moved forward by the gap. In New York, '2026-03-08T02:30' comes back as a Date for 03:30 EDT. The chart’s own arithmetic is not affected: a floating day stays 24 hours.

How to pass dates without a shift:

Do Don’t
start: '2026-03-02' start: new Date('2026-03-02')
start: new Date(2026, 2, 2) (local, month from 0) start: date.toISOString() (ends with Z: rejected)
start: '2026-03-02T09:30' start: '2026-03-02T09:30:00Z'

If your source gives instants, such as UTC timestamps from a server, decide which wall clock the plan lives on and convert once, before the chart: format the instant in that zone (for example with Intl.DateTimeFormat or your date library) and pass the resulting string without an offset. If you pass new Date(instant) instead, each viewer sees the instant on their own clock, which is what you want for “when is this meeting for me” and not for a shared plan.

The same applies to the dates you read back: record.start is a local Date with the wall-clock fields of the task. Format it with its local getters or with a formatter that uses the local zone; toISOString() converts to UTC and shifts it again.

Calendar-aware arithmetic goes through a DateAdapter: adding months, the start of a week, a month or a year, the day of the week, ISO weeks, and locale formatting. The default engine is @internationalized/date (Gregorian calendar, no zone), which also validates ISO strings and knows the length of every month. createFloatingAdapter({ weekStartsOn }) creates one: weeks start on Monday unless you say otherwise, and formatting runs Intl over the wall-clock fields, ignoring the zone, so header labels and tooltips show the same numbers everywhere.

The chart builds its own adapter. There is no option to replace it, and the first day of the week is Monday; the adapter is for the building blocks of @ganttlane/core (createTimeScale, headerRows, snapTime) that take one. Fixed-length work, such as days and hours, is plain arithmetic on the numbers.

The time scale is linear: x = (t - origin) * pxPerDay / 24 hours. Only pxPerDay changes between view modes. Because a day is a fixed width, months and years get their real length on screen: with the month view mode at 4 px per day, February is 112 px wide and March 124 px. The hour mode at 960 px per day is 40 px per hour. Pixel values are not rounded; snapping a drag to a step is a separate rule (see Granularity and alignment). The view modes example and the custom view mode example show the scale at work.

“Today” is read from the runtime’s local clock (or from your now option, which returns a DateInput) and truncated to the minute, so the today line follows the viewer’s local time.