A large plan

The chart draws only what you can see: the rows in view, and the bars, links, grid lines and days that belong to them (plus a few beyond the edges, so that scrolling does not show gaps). A plan of ten thousand tasks costs the DOM about what a plan of a hundred does. This example generates a plan of the size you choose, with a link from each task to the one before it in its chain, and says how long the chart took from being asked for to having its first bars on the screen. The two buttons jump to the ends of the plan.

Terminal window
pnpm add @ganttlane/dom # vanilla
pnpm add @ganttlane/react react react-dom # React
View on GitHub
data.ts
import type { Link, Task } from '@ganttlane/core';
/** The sizes the select offers. */
export const COUNTS = [100, 1_000, 5_000, 10_000] as const;
/** The size the chart opens with: enough to see what the chart does, light enough for a page. */
export const DEFAULT_COUNT = 1_000;
const TEAMS = ['Backend', 'Frontend', 'Docs', 'Marketing', 'QA', 'Design'] as const;
const STAGES = ['Design', 'Build', 'Review', 'QA', 'Release'] as const;
/** How far each stage of a chain has got: the first is done, the second is under way. */
const PROGRESS = [100, 50, 0, 0, 0] as const;
/** The date `n` working days after Monday 2026-01-05, as `'YYYY-MM-DD'`. */
function workingDay(n: number): string {
const calendarDays = Math.floor(n / 5) * 7 + (n % 5);
return new Date(Date.UTC(2026, 0, 5 + calendarDays)).toISOString().slice(0, 10);
}
/**
* Makes a plan of `count` tasks, with no randomness: the same count gives the same tasks every
* time. The tasks come in chains of five (Design, Build, Review, QA, Release), each one starting
* after the one before it and linked to it, and the chains start a few days apart, so the chart
* is a long staircase. Every task starts and ends on a working day, so no task is in conflict
* with the weekends.
*
* @param count - How many tasks.
* @returns The tasks (ids `t1` … `t<count>`) and about four links for every five of them.
*/
export function generate(count: number): { tasks: Task[]; links: Link[] } {
const tasks: Task[] = [];
const links: Link[] = [];
let day = 0;
for (let i = 0; i < count; i++) {
const chain = Math.floor(i / STAGES.length);
const stage = i % STAGES.length;
if (stage === 0) day = (chain * 3) % 90;
const length = 2 + ((chain * 7 + stage * 3) % 5);
const team = TEAMS[chain % TEAMS.length] ?? 'Team';
tasks.push({
id: `t${String(i + 1)}`,
name: `${team} ${String(chain + 1)} · ${STAGES[stage] ?? ''}`,
start: workingDay(day),
end: workingDay(day + length - 1),
progress: PROGRESS[stage] ?? 0,
});
if (stage > 0) links.push({ source: `t${String(i)}`, target: `t${String(i + 1)}` });
day += length + ((chain + stage) % 2);
}
return { tasks, links };
}
// What `createGantt` and the tests get: the plan at its default size.
export const { tasks, links } = generate(DEFAULT_COUNT);

Files

  • data.ts: generate(count), a deterministic generator of tasks and links, and the plan at its default size (1,000 tasks) as tasks and links.
  • options.ts: the view mode, the first scroll and compact rows.
  • helpers.ts: onFirstPaint, which times the first bars, and describe.
  • vanilla.ts: a new chart for each size, and scrollToTask.
  • react.tsx: the same, with a key that makes a new chart for each size.

The plan

generate(count) has no randomness: the same count gives the same tasks every time. The tasks come in chains of five (Design, Build, Review, QA, Release), named after a team and the number of the chain (Backend 1 · Design). Each task starts after the one before it and is linked to it (t1 → t2 → …, four links for every five tasks), and each chain starts three working days after the one before it (over thirty chains, and then from the start again), so the plan is a row of staircases. Every task starts and ends on a working day, so no bar is in conflict with the weekends. Ids are t1 … t<count>.

Options

Option Value What it does
viewMode 'week' The scale of the timeline (React: defaultViewMode, as nothing here changes it)
scroll.initial 'first-task' Opens on the plan, at its first task
layout.rowHeight 28 Compact rows: more of the plan on the screen
layout.barHeight 18 The height of a bar inside its row

What to try

Pick 10,000 and read the line under the chart: it is the time from the moment the chart was asked for (generating the plan is not counted) to the first animation frame that has bars in it, on your machine. Pick a few sizes to see how it grows with the plan: the chart creates its model of every task once, but draws a screenful. Press Last task: the chart is at the end of a plan of ten thousand rows at once (scrollToTask, which here is instant: a smooth scroll through three hundred thousand pixels would take a while). Drag a bar and the tasks that follow it move with it, as they do on a plan of four.

Notes

  • What is drawn. With the plan of 10,000 tasks, the chart holds about twenty rows, a dozen bars and as many links in the DOM at a time, whatever the size of the plan. That is the virtual window: the rows in view, and a few more on each side (overscan).
  • Where the time goes. Creating a chart reads every task once: it validates the shapes, parses the dates, builds the tree and the graph of links, and works out the rows. That is the part that grows with the plan. Drawing does not.
  • Changing the data. To change some tasks, give setTasks the new list: it is diffed by id, and only what changed is recomputed. A new chart, as this example makes for each size, is for a plan that is a different one altogether (in React, a key does it).
  • Generating data. The generator is a plain function of the count, so that the data is the same in the tests, in the code tabs and on the page. It makes its dates by counting working days from a Monday; the chart does its own date arithmetic through its date adapter.
  • What the number is. onFirstPaint watches the chart’s element for the first .gantt__bar and then waits for one more animation frame. It measures this page, in this browser, with whatever else is running: use it to compare sizes, not as a benchmark. For the numbers of the library, run the repository’s pnpm bench, or open the playground’s /bench/ page (a generated plan of 1k or 10k tasks, scrolled and dragged automatically, with timings).
  • When a plan is too large to load at all, load it by date range: the infinite timeline’s onRangeChange says which range the chart now shows (Infinite timeline), and setTasks takes what you fetched.